Logistics & production
Overall equipment effectiveness Calculator
Separate manufacturing availability, speed performance and first-pass quality. This free overall equipment effectiveness calculator shows the calculation and its assumptions so you can compare your own figures.
Your results
Separate manufacturing availability, speed performance and first-pass quality.
Calculated outcomes
- Run Minutes
- 420
- Ideal Cycle Needs Review
- No
Assumptions and estimates
- OEE = availability × performance × quality. Planned time excludes scheduled non-production. Performance is capped at 100%; a higher raw result signals that ideal cycle time or production counts need review.
- Method: OEE = availability × performance × quality. Performance compares ideal cycle production time with actual run time.
- Planned non-production is excluded from planned time. A raw performance over 100% triggers a cycle-time review and is capped in OEE.
Useful next steps
- Use Compare options to test an alternative side by side.
- Copy, print or download a record of this calculation when you need one.
Reports open your email app addressed to s@s1.ie with the public page address only. Your inputs are never added.
How the overall equipment effectiveness calculation works
OEE = availability × performance × quality. Performance compares ideal cycle production time with actual run time.
Planned non-production is excluded from planned time. A raw performance over 100% triggers a cycle-time review and is capped in OEE.
Using this calculator
- Enter your own figures in the labelled inputs. Keep the currencies, units and time periods consistent.
- Choose any applicable rate profile, pattern or assumption shown for this tool. Open additional inputs when relevant.
- Review oee percent and availability percent and performance percent and quality percent, then read the stated assumptions and eligibility conditions before using the result.
Worked example
This is a static example using illustrative inputs, not facts about you or today’s date. The displayed eligibility selections and assumptions apply only to this example.
See example inputs
- Planned production time (minutes)
- 480
- Unplanned downtime (minutes)
- 60
- Ideal cycle time per unit (seconds)
- 30
- Total units produced
- 700
- First-pass good units
- 665
- Oee Percent
- 69.27%
- Availability Percent
- 87.5%
- Performance Percent
- 83.33%
- Quality Percent
- 95%